Why Ground Testing is Important to Maintain Adequate Grounding And Bonding
Ground testing is typically performed in two stages. The first is conducted during the construction of a building to ensure proper installation of the electrical system. The second involves routine ground testing to ensure the ‘actual’ arrangements perform as ‘predicted’ at the design stage, thus avoiding costly and fatal errors.